Three questions in the continuing thread:
* The electric staff instruments should be housed in the new panel room, 
built above the relay room (adjacent to the former signalbox).
* During construction, there was no intermediate instrument at the entry 
to Goninan.  Another poster has hinted that one will be provided, but not 
yet.
* A down train terminating at Spotswood should show Werribee still.
* Work has also been in progress between Footscray and Sunshine.  
Passengers after 20.00 for the current week have to travel on a Werribee 
train to Footscray, then join a bus.  As noted elsewhere, a ballast train 
for this work on Sat.26.4 had S-2xH (S leading).
-- 